FINE-GRAINED DRY CONCRETE (SB)

Information

PROPERTIES
Resistant to moisture and cold. Plasticity, good adhesion to surfaces, made of natural materials.

SURFACE PREPARATION
Surfaces in contact with concrete must be clean, solid, ice-free, and non-soggy.

MIXTURE PREPARATION
Pour the contents of the package (25 kg) into 3 to 4 litres of clean room temperature water. Mix manually or mechanically until homogeneous until homogeneous. Leave for 3-5 minutes, then stir again. Duration of use of prepared mix: up to 2 hours, depending on the ambient temperature.

CONSUMPTION AND OUTPUT
65 kg/m² per 40 mm thick layer

STORAGE CONDITIONS
Store in a dry place, protect from moisture, do not damage the original packaging.

SHELF LIFE Best for 12 months after the date of production.

ATTENTION! WORK SAFETY
Work at an ambient temperature between + 2 °C and + 30 °C, avoid drafts and direct sunlight. All recommendations provided are valid at a temperature of + 20 °C and relative humidity of 60%. At other conditions primer properties may change.

INSTRUCTIONS FOR USE

Evenly spread the prepared mix over the prepared area or construction formwork. When a structure is to be concreted using concrete mixed during different sessions, time intervals between filling forms should be as short as possible. Use spatula to evenly distribute and compact concrete. Use electric vibrators to compact large volume constructions. When concreting floor, the layer should be thicker than 4 cm. Taking into account the design load, a reinforcing mesh with appropriate eye size should be used raising it 1-3 cm from the concreted surface, depending on the layer thickness. When pouring concrete, it is important to carefully fill the form under the mesh.
The first three days after laying concrete, protect the surface from drafts, cold and direct sunlight.
In a closed dry room or in hot weather, the concrete surface should be watered for the first three days to avoid excessive drying. The concrete surface that cracks and becomes brittle after several days shows a lack of concrete maintenance and watering while drying. As a result, such may be lacking in strength
After 3 days at a temperature of + 20 °C and relative humidity of 60%, you will be able to carefully walk the surface. The full specified concrete strength will be achieved after 28 days.